Project Name: Power Supply and Distribution Project of the First Affiliated Hospital of Zhengzhou University
Project location: South of North Third Ring Road, Zhengdong New District, West of Longhu Middle Ring Road
Project Introduction: The "Power Supply and Distribution Project of the First Affiliated Hospital of Zhengzhou University" is located south of the North Third Ring Road and west of Longhu Middle Ring Road in Zhengdong New District. It is planned to construct outpatient clinics, medical technology buildings, inpatient buildings, ward buildings, infection control buildings, etc., with a total construction area of 750,000 m2, including 448,311.51 m2 of aboveground building area and 333,758.60 m2 of underground building area.
Project content: The installed capacity of the official power transformer is approximately 58,900 KVA, with dual power supply. For the current phase, an application has been made to install 4*630 KVA infrastructure transformers for infrastructure power supply.
In the evaluation of "2021 Henan Province Construction Industry Integrity Model Enterprise and Excellent Project Manager" by the Henan Provincial Construction Industry Association in 2022, our company's Li Haijun, Wang Guojing, and Zhang Shuaibing were awarded the honorary title of "Excellent Project Manager of Henan Province Construction Industry Enterprise". With years of experience and dedication, their hearts and hands are united. With the clearest original intention and the most tenacious attitude, they have tempered themselves and created exquisite products. Li Haijun, a mid-level engineer in the second level construction division, serves as the following
There is a kind of determination called 'united as one, overcome difficulties together', and a kind of dedication called 'sacrifice small homes, take care of everyone'. The sudden COVID-19 swept through Zhengzhou. For a moment, shopping malls, residential areas, office spaces, communities, etc. were all "locked down". Although the city slowed down, the operation and maintenance of power equipment could not stop for even a minute. Botai Power's operation and maintenance personnel have been on the front line 24 hours a day since the outbreak of the epidemic, demonstrating their responsibility and dedication through actions, silently dedicating themselves to fulfilling their original mission and becoming a part of the epidemic
It is said that the gaps between fingers are too wide, time is too thin, and I have not yet realized that the three summers have ended. The time has already turned into a new autumn, although there are still frequent hot waves rolling, the footsteps of autumn have arrived at the doorstep. Let's follow the gentle breeze, step on fallen leaves, slow down the pace of life, and enjoy the beautiful parent-child time of autumn. All the beauty comes as scheduled for parent-child team building. In order to help everyone relax, release stress, and enhance communication and exchange among colleagues amidst busy work and life, on September 3rd, Botai Electric organized the "Unity and Happiness" event